Alkaline zinc plating brightener

This process is a new alkaline zinc plating process without cyanide. Its unique formulation provides excellent distribution force to the bath without affecting plating rate and cathode efficiency. The main advantages for users include reduced plating time

Send Inquiry

Appendix

Product Description

Alkaline zinc plating brightener

Environmental protection hanging galvanizing brightener

 

Product Code No. 51015

Description and features :

This process is a new cyanide-free alkaline zinc electroplating process. Its unique formula provides excellent distribution power to the plating solution without affecting the plating rate and cathode efficiency. The main advantages for users include reducing plating time , making zinc more efficient in use , simple operation and not easy to burn , and easy operation.

Features:

Excellent covering ability and zinc deposit distribution

Simple waste disposal

Wide operating range

Reduce plating time

Allows high current density operation without burning.


Preparation for bath building

The used tank must be thoroughly cleaned to remove the previous solution; or the new tank must be soaked with 10% warm sodium hydroxide solution.

Bathing requirements

 

Zinc metal

1 0-14g/l

Sodium hydroxide

1 20-145g/l

Conditioner (51011)

25-30ml/l

Cylinder opening agent (51012)

6 - 8 ml / L

Brightener (51015)

1-2ml/l

Wetting agent (51016)

0.1-0.3ml/l

step

Method one :

Low cost and time-consuming

Composed of zinc and caustic soda.

Provide ventilation equipment for the built bath.

Add 1/2 of the working volume of cold water to the building bath and add the required amount of wetting agent.

Adding sodium hydroxide into the groove of quality, in a bath with a slot on the basis of the working volume of about 120g / l sodium hydroxide to a desired concentration distribution. If there is no ventilation, the tank will heat up and produce a suffocating pungent smell.

Warning: Sodium hydroxide will release heat when it is dissolved. Add slowly in a wide area and stir well to avoid boiling and splashing.

Put many stainless steel baskets full of zinc balls in the tank we are going to use. In the process of zinc ball dissolution, zinc needs to be in direct contact with stainless steel to complete the current connection.

Keep the bath temperature above 32 ℃, the dissolution rate of zinc in the cold solution is slow. Allow the working fluid to work for 16-24 hours, or until the zinc concentration (depending on the working volume of the bath tank ) reaches about 11.3g/l .

Next, add the required amount of regulator, opener and brightener in sequence.

 

Method Two

The cost is higher, but the operation is easy, safe and fast.

1.Typical dosage requirements of zinc concentrate

Zinc concentrate

Final zinc metal concentration

Sodium hydroxide concentration requirements

13% by volume

10g/l

62.4g/l

Volume ratio 16%

12g/l

67.5g /l

Volume ratio 19%

15g/l

36g/l

 

Mix tank with zinc concentrate

Add 1/2 of the tank volume of water, and add the required amount of sodium hydroxide according to the above table. Slowly add high purity sodium hydroxide to the tank while stirring.

 

Warning: Sodium hydroxide will release heat when it is dissolved. Add slowly in a wide area and stir well to avoid boiling and splashing.

A volume ratio of 10-20% of the zinc concentrate (depending on the desired concentration of zinc), and stirred.

Add the bath liquid to the operating liquid level with water and mix thoroughly.

Add the required amount of regulator and opener in sequence.

2 . Routine bathing techniques

Use high-purity caustic soda.

After all the additions are completed, stir the bath vigorously; use 18ASF ( 2.0ASD ) current density electrolysis for more than 24 hours before use .

3 . equipment

The groove is preferably steel or PP . The auxiliary tank must be steel and cannot be lined.   

Filtering is recommended. It is important to use a filter at the junction with the nozzle to remove floating contaminants. 

Anode low carbon steel sheet or ductile mesh 

4 . Tank fluid maintenance

Operation as a reference number        

 

Fan Wai     

Maintenance care     

Zinc metal

10-14g/l

Zinc division by dissolving and analysis

Sodium hydroxide

120-145g/l

after analysis

Cylinder opening agent (51012)

0.6-0.8% volume ratio

By Bigely ' Service Lab recommendations

Brightener (51015)

0.1-0.2% volume ratio

150-250ml/KAH

Additives (51014)

 

50-70ml/KAH

 

Wetting agent (51016)

0.1-0. 3ml/l

 

Modifier

25-30ml/l

Each additional 50 Kg of sodium hydroxide was added . 5 -1 0 liter

temperature

25-30 ℃

 

Cathode current density

0.5-6.05 ASD

 

Anode current density

1.0-2.0 ASD

 

 

5 . Bath composition

 

Zinc metal

The zinc metal concentration is maintained by the zinc anode zone and the sodium hydroxide concentration. Chemical dissolution in the auxiliary tank is a better way to dissolve zinc. The maintenance parameters of zinc have been given in Section 4. It should be noted that if the anode ball is not in good contact with the steel, zinc will not dissolve quickly. Zinc oxide will not dissolve without excessive caustic soda and is not suitable for adjusting the zinc concentration.

 

Sodium hydroxide

The fourth section has given the parameters to maintain the sodium hydroxide level. In order to maintain its concentration at the required level, it is recommended to add a small amount of sodium hydroxide regularly. Neglecting this will affect the zinc concentration. It is very important to use a good grade of caustic soda because corrosivity is the source of purity.

 

Sodium carbonate

The total sodium carbonate content cannot exceed 90g/l .

 

6 . main ingredient

 

Zinc

    It is recommended to maintain by chemical zinc dissolution. For a large-scale plant, it is better to separate the dissolving tank by a circulating pump. Control through analysis.

Sodium hydroxide

     It is recommended to maintain through analysis.

Adjusting agent (51011)

     Adjusting agent should be added in proportion to the sodium hydroxide, is added per 50kg of sodium hydroxide was added . 5 -1 0 liter adjusting agent.

Cylinder opening agent (51012)

     Sometimes it is added to make up for the loss.

Brightener (51015)

     Mainly supplement materials to control the distribution of plating and the brightness of deposits. The range of addition according to performance needs is: 150ml-250ml/KAH

Additives (51014)

     This material has a well-controlled deposition distribution, and its addition rate is: 50ml-70ml/KAH

Wetting agent (51016)

     It should be added according to the need to control foam. Be careful when adding this product. Excessive addition will cause excessive foam. When should add 0. 1 ml of / L increase.

     Replenishment of zinc metal consumed by electroplating

     There are two methods to choose from

Preferred method

     It is recommended to have a separate zinc " dissolution tank " . This tank can be adjusted to make the solution from the electroplating tank to the dissolution tank. It should contain a conventional steel basket with zinc balls (must be in contact with the steel to ensure the efficiency of zinc dissolution). The solution is pumped out, passes through the filter, and then enters the electroplating tank. The zinc area will be adjusted again until the concentration remains reasonably stable.

Alternative methods

     Hang a conventional mild steel basket (the basket contains zinc balls) in the tank. For convenience, these steel basket suspended on the anode beam, but must be insulated with it . In order to maintain the zinc concentration in a suitable range, the number of baskets must be carefully adjusted. During periods of prolonged downtime, these baskets should be removed. This system is more suitable for small equipment, but it is more difficult for large equipment.

Judgment of adjuster and gloss agent

     To avoid errors in free operation, the most fundamental method is to control the parameters of the process within the range given in the data sheet. The concentration of zinc and caustic soda is easy to determine by chemical analysis, but it is more difficult to control all additives. Hull Cell test can be used . It is best to use a method to accurately measure the deposition thickness (such as coulomb measurement and XRF measurement) law).

     Per day at 25 deg.] C . 1A / 10 solution was minute Hull Cell Test , the Hull Cell plating on the sheet 40 , 20 and . 5 the ASF ( 4.0 , 2.0 and 0.5 the ASD ) area tested deposition thickness. In order to be consistent when determining the deposition thickness, it is necessary to use a steel anode and a pre-cut template. A good working solution, operating under the parameters given in the data sheet, should be plated with a clear Hull Cell sheet after passivation treatment . The ratio of plating thickness between A and C should be between 1.2:1 and 1.6:1 .

 

Expected condition of plating thickness

1A/10min T=25 ℃

Zn=12.5g/l

NaOH=135g/l

3.0-3.5 2.5-3.5 2.0-3.0

x x         x

    A B C

 

       Hull Cell test

Explanations and answers

The zinc thickness is only low at A :

     Low zinc (electroplating loss in high current density area, A : C thickness ratio is less than 1.25 )

     Excessive additives (electroplating loss in high current density area, A : C thickness ratio is less than 1.25 )

     The thickness of zinc is high at A and low at C ( A : C thickness ratio is greater than 1.6 )

     a ) High zinc concentration

 

Low additive concentration

The thickness at C is low, the thickness of A and B are within the range

     a ) Excessive brightener

     The thickness of A , B and C is low

     a ) Excessive brightener ( A : C ratio is appropriate)

     b ) Excessive additives and brighteners ( A : C is less than 1.25 )

     c ) High carbonate content, higher than 75g/l

     High concentration of regulator (volume ratio greater than 4% )


FAQ

1. Q: Do you make the products yourself? Are you a trader or a manufacturer?

A: Yes, the products are produced by our company. Our company is a manufacturer focusing on the R&D and manufacturing of environmental protection electroplating additives. Our factory has 5000 square meters with an annual capacity of 15000 tons.

2. Q: Can your company send samples for trial?

A: We can provide samples for trial.

3. Q: What is the quality of your products?

A: Our company all products core raw materials is used by Germany BASF, American Dow Chemical and other international brand products. The production process is strictly in accordance with the ISO9001 quality management system, from the incoming inspection, product inspection, according to the strict inspection standard, ensure that every drop of products qualified. Product quality you can rest assured, like BYD, Huawei, Foxconn such enterprises are also using our products.

4. Q: How long is the shelf life of your products?

A: The shelf life of our products is two years. If you do not use up the products within a short time after you buy them, we suggest you store them in a cool place, not in the sun or in a high temperature environment.

5. Q: Are your products environmentally safe?

A: Our products have passed the SGS test and are recognized as "Green and Environment-friendly Promotion Products". Many auto parts and electronic products which use our products can pass the strict environmental protection test when they are exported to Europe and America. Therefore, we can be trusted in terms of environmental protection and safety.

6. Q: Can your company provide technical services?

A: Yes, our company has a technical service team of more than 10 people. The technical engineers all have more than 20 years' experience in electroplating factory. They can provide customers with comprehensive technical of pre-sales and after sales.

7. Q: Is it possible to visit your company?

A: Yes, of course. You are very welcome! We can meet you at Jieyang airport, If you can come to our city. Also you can visit our factory through live video.

8. Q: Can you customize products according to our needs?

A: Yes, our company has research and development strength, the product formula derived from Europe and the United States laboratory, European and American engineers technical support, work together with domestic universities. Our company has a member of Guangdong province expert enterprise workstation, Shantou university science and technology correspondent workstation, Jieyang city environmental protection e

Product Tag

Related Products

Send Inquiry

Should you have any enquiries, please kindly fill in the Enquiry Form below . We will reply you within 24 hours.